It can take hours to days.  A smaller system like our AFS 200 can take 20 minutes to assemble the foundation and the same to assemble the pole.  Our largest system, the AFS 2000, will take a day to assemble and a few days to load ballast and install pole.  Pole heights, equipment, number of works, type of ballast – will all affect the install time.